Made from SafeSmart’s very own steel Proscaf, this scaffold tower system saves time and money on site pre-assemble off site and simply crane the pre-erected tower into position, thanks to its certified lifting points. Two configuration options accommodate either stretcher stairs (16m) or our Z stairs (20m height).
Compliant to AS/NZS 1576 : 2010, this tower is ideal for large infrastructure projects, and can be customised to suit access to anywhere utilising Proscaf components, custom-fabricated elements or with AdjustaStairs, excellent for headstock access.
This tower has been independently engineered and certified effectiveness and safety guaranteed.
Made from SafeSmart’s very own steel Proscaf, this scaffold tower system saves time and money on site pre-assemble off site and simply crane the pre-erected tower into position, thanks to its certified lifting points. Two configuration options accommodate either stretcher stairs (16m) or our Z stairs (20m height).
Compliant to AS/NZS 1576 : 2010, this tower is ideal for large infrastructure projects, and can be customised to suit access to anywhere utilising Proscaf components, custom-fabricated elements or with AdjustaStairs, excellent for headstock access.
This tower has been independently engineered and certified effectiveness and safety guaranteed.